Back to presentation

Turbines

Bracell Star Project

Loading of turbines in Jundiaí and movement, using lines of 18 to 24 axles, to Bracell;

Receipt of generators (under hook), using a 16-axle line, at the Port of Santos and displacement to Bracell;

Unloading operation of all heavy units using platform gantry cranes at Bracell;

Engineering service (own team/staff);

All wagons from the Port of Santos or Jundiaí to Bracell for all loose items, including SOC containers.

Details

  • Origin

Port of Santos, SP Brazil

  • Fate

Lençóis Paulista, SP Brazil

  • Load Type

Power Turbines

  • Volume

550 ton